Base Concreting of RCC Ring Wall
Bar-Bender Machine
Beam Rebar Cage Placement through Crane
Plastering Work
Residential Project of Only Ground Storey
Oil Storage Tank Foundation Construction Step-by-Step
Sand Compaction Layer-by-Layer
Hard Strata During Excavation
PCC for RCC Ring Wall
Base Compaction for Oil Storage Tank Foundation
Inspecting Starter Dimension
Workers meanwhile Concreting
Bituminous Coat to Protect Sub-Structure from moisture
Evaporation Pond for storage of Chemically Toxic & Polluted Water
Crane Activity
Installation of Cathodic Protection for Detecting any Damaged in Oil Storage Tank Foundation
Shuttering Fail Due to inadequate Lateral Supports
Wall of Septic Tank Cracks due to Excavator exerted lateral Pressure